BEFORE OPERATION

Confirm all three items:

  • Installation is complete

  • Battery is connected, if fitted

  • Correct country/grid code is set


START-UP

Use after installation is complete

1 Turn ON all installation breakers.

2 Turn ON the inverter DC switch.

3 If a battery is fitted, turn ON its power button.Steps 2 and 3 may be completed in either order.

4 Press the inverter ON/OFF button on the left side of the enclosure.


SHUTDOWN

Battery power OFF before battery breaker

1 Turn OFF the AC breakers for the Grid, Load, and GEN ports.

2 Press the inverter ON/OFF button.

3 If a battery is fitted, turn OFF the battery power/BMS button.

4 Turn OFF the battery-side DC breaker.

5 Turn OFF the inverter DC switch.


PV OR GRID OPERATION WITHOUT A BATTERY

The LCD may remain lit and display "OFF". Press the inverter ON/OFF button, then select "NO batt" in the inverter settings to enable operation.


IMPORTANT - COUNTRY / GRID CODE

Select the country/grid code required by the local distribution network operator before grid connection. Requirements vary by country and operator. If unsure, consult a qualified electrical engineer or the local electrical safety authority.