For installer and user reference
BEFORE OPERATION
Confirm all three items:
Installation is complete
Battery is connected, if fitted
Correct country/grid code is set
START-UP
Use after installation is complete
1Â Turn ON all installation breakers.
2Â Turn ON the inverter DC switch.
3Â If a battery is fitted, turn ON its power button.Steps 2 and 3 may be completed in either order.
4Â Press the inverter ON/OFF button on the left side of the enclosure.
SHUTDOWN
Battery power OFF before battery breaker
1Â Turn OFF the AC breakers for the Grid, Load, and GEN ports.
2Â Press the inverter ON/OFF button.
3Â If a battery is fitted, turn OFF the battery power/BMS button.
4Â Turn OFF the battery-side DC breaker.
5Â Turn OFF the inverter DC switch.
PV OR GRID OPERATION WITHOUT A BATTERY
The LCD may remain lit and display "OFF". Press the inverter ON/OFF button, then select "NO batt"Â in the inverter settings to enable operation.
IMPORTANT - COUNTRY / GRID CODE
Select the country/grid code required by the local distribution network operator before grid connection. Requirements vary by country and operator. If unsure, consult a qualified electrical engineer or the local electrical safety authority.