This video provides a complete guide to the unboxing, installation, and setup of the Deye AI-W5.1-B battery and SUN-10K-SG02LP1-AU hybrid inverter system.


  • Unboxing and Inspection

  • Battery Accessories Overview

  • PDU Interface Introduction

  • Tools and Safety Gear

  • Battery Module Stacking

  • Inverter Grounding Connection

  • Battery Wiring and Communication Setup

  • Parallel Battery Connection

  • AC Cable Connection

  • Partial and Whole-House Backup Wiring

  • PV Connection Setup

  • CT and Meter Wiring

  • Data Logger Installation and Network Configuration


By following these steps, installers can safely complete the full unboxing, wiring, and setup process for the Deye hybrid inverter and battery system, preparing it for commissioning and operation.


Check the related document below or visit our product list: https://www.solarwyse.com.au/products for latest updates.


AI-W5.1-B Datasheet:


AI-W5.1-B User Manual:


©2023 by Being Energy Wise Pty Ltd T/as Solarwyse

bottom of page